Fairtex Completed Shut-down Of OML 102 FFSD Campaign Project

Fairtex Completed Shut-down Of OML 102 FFSD Campaign Project

Fairtex Integrated Services Ltd has completed the shut-down of OML 102 FFSD Campaign Project, in compliance with client requirements. The project which covers divers scopes as follows:

OFD Oil Manifold Depressurization Valves Replacement:
Replacement of Corroded Instrument Airlines
Replacement of corroded Flow-lines
Flare Tripod Painting.

Was completed in due time in accordance with client ( Total E&P Nigeria Limited) requirements.