Campaign of scope covers:
OFD Oil Manifold Depressurization Valves Replacement: which covers:
1. Spading and isolation
2. Decommissioning of existing 2" headers and associated piping
3. Cut, Fit-up and weld and tie-in joints
4. Deseeding
Scope: Replacement of Corroded Instrument Airlines
1. Spading and Isolation
2. Decommissioning of existing spools
3. Fit-up & Weld
4. NDT (MPIRDT)
5. Repair / NDT Incase of NDT Failure
6. Perform Ant-Corrosion Activities
7. De-spading
Scope: Replacement of corroded Flow-lines
1. Spading and Isolation
2. Decommissioning of existing spools
3. Fit-up & Weld
4. NDT (MPIRDT)
5. Repair / NDT Incase of NDT Failure
6. Perform Ant-Corrosion Activities
7. De-spading
8. Hydro testing
Scope: Flare Tripod Painting
Scope: Insulation Works
Scope: Security Door Fabrication
Scope: Scaffolding
Total E&P Nigeria Limited
Offshore
2026
Completed
Offshore/Onshore Construction & Installation Division