Fairtex Group pairs the right crews with the appropriate equipment to optimize well completions for today’s shale development projects, aiming to reduce cycle times and costs. Our fleet is purpose-engineered for long laterals and high-intensity, pad-based completions. With experienced crews and drill-out rig specialists, we ensure safe and efficient well completion services.
Frac Plug Drill Outs
- Pre-job planning is conducted to identify and mitigate potential downhole issues that could lead to delays.
Real-time data is captured to enhance drilling operations.
- Our experienced 24-hour completion crews have performed hundreds of drill-outs.
- We utilize high mast rigs up to 117’, with 50% of our rigs equipped with masts 110’ or taller.
- Our rigs boast a hook load capacity of up to 300,000 lbs, allowing us to safely and effectively reach the toe of the longest laterals.
- We offer the highest horsepower range (750-2,500hp) of fluid pumps in the industry, ensuring constant rate and pressure for smooth drilling operations while maintaining turbulent flow to remove sand and debris.
- We provide complete well site support equipment, including high-torque swivels and extended-reach catwalks.
Tube Ups
We offer fast and reliable service to run production tubing following frac plug drill outs.
Chemical Mixing
Fairtex Group has designed and built a data-driven chemical mixing and injection system for use with either stick pipe or coil tubing applications. This system increases efficiencies during drill outs through precision control and metering of chemicals.